Monday 17 July 2017

Progress at the Flat
The septic tank is well underway,


 and Tony is pretending to work hard ๐Ÿ˜„
 The lads have shifted the big ranch slider that was bought second-hand for the front of the flat. It turned out to be too big, so Tony will either find another use for it or sell it. It is now between the new flat and the flat just behind ours (a mirror image of ours).
The lid for the tank is formed up.
and a couple of days later the tank is almost finished, just one side left to be plastered. 
It is in between the new flat and the back portion of Tony and Mary's house. Their back door will be sealed off.
New steps will be built above the tank leading to another flat yet to be built above the one almost completed.
The waste pipe for the kitchen sink has been cut into the concrete wall but not connected through to the inside yet.
Formwork for the underside of the new steps fits snugly around the toilet soil pipe.
Inside the bathroom tiles are looking good.

The first stage plumbing for the shower and basin is complete.